/akn/my-12/state_subsid/2024/electricity-supply-regulations-2024

Electricity Supply Regulations 2024

The full official text, structured for quick navigation. Copy any provision or jump straight to a section.

Open source PDF
Type
State Subsidiary Legislation
Status
In force
Enacted
2024
Sections
28

Quick answer

About this state subsidiary legislation

Electricity Supply Regulations 2024 is Malaysia State Subsidiary Legislation, cited as State Subsidiary Legislation 2024 2024, currently marked in force and first recorded in 2024.

Opening note

Preamble

Suggest a correction
  1. IN exercise of the powers conferred by section 110 of the Electricity Supply Enactment 2024, the Minister, makes the following regulations:

Part I

PART I

PRELIMINARY

Suggest a correction

Citation and commencement

12

Interpretation

“accessory” means a device, other than current-using equipment, associated with such equipment or with the wiring of an installation;

“accreditation authority” means the Director General of the Department of

Standards as specified in the Standards of Malaysia Act 1996 [Act 549];

“apparatus” means any electrical apparatus and includes the device or fitting in which a conductor is used, or of which it forms part of;

“appliance” means any device which utilises electricity for a particular purpose;

“bare” means not covered with or protected by insulating material;

“cable” means a length of insulated single conductor, whether solid or stranded, or of two or more such conductors, each provided with its own insulation, which are laid together. The insulated conductor or conductors may or may not be provided with an overall covering for mechanical protection;

“Cable Jointer” means a person who holds a Certificate of Competency as a

Cable Jointer issued under regulation 54;

“Certificate of Approval” means a Certificate of Approval issued by the

Commission for the manufacture, import, display, sale or advertisement of any electrical equipment in the area of jurisdiction of the Commission;

“Certificate of Conformity” means a certificate issued by a conformity assessment body;

“Chargeman” means a person who holds a Certificate of Competency as a

Chargeman issued under regulation 52;

“circuit” means an electrical circuit forming a system or a branch of a system;

“circuit breaker” means a mechanical device for making and breaking a live circuit, such as a short circuit, where the circuit is broken automatically;

“communications” has the meaning assigned thereto in the Communications

13

and Multimedia Act 1998 [Act 588];

“Competent Electrical Engineer” means a person who holds a Certificate of

Competency as a Competent Electrical Engineer issued under regulation 48;

“conformity assessment body” means a foreign or local conformity assessment body whose activities and expertise includes performance of all or any stage of the conformity assessment process;

“consuming apparatus” means an apparatus which is intended to consume electricity;

“distributing main” means the portion of any main with which a service line is or is intended to be immediately connected;

“domestic installation” means an installation in a private dwelling which is not used in any hotel or boarding house or for the purpose of carrying out any business, trade, profession or service;

“earthed” means connected to the general mass of the earth;

“efficiency rating label” means a label which provides information of energy performance level of an equipment as specified in regulation 111;

“electric sign” means a neon sign or other consuming apparatus of like nature operating more than 400 volts;

“Electrical Contractor” means a person who holds a Certificate of Registration as an Electrical Contractor issued under regulation 78;

“Electrical Repair Contractor” means a person who holds a Certificate of

Registration as an Electrical Repair Contractor issued under regulation 91;

“Electrical Services Contractor” means a person who holds a Certificate of

Registration as an Electrical Services Contractor issued under regulation 74;

“Electrical Services Engineer” means a person who holds a Certificate of

Competency as an Electrical Services Engineer issued under regulation 47;

“Electrical Sign Contractor” means a person who holds a Certificate of

Registration as an Electrical Sign Contractor issued under regulation 87;

14

“Electrical Supervisor” means a person who holds a Certificate of Competency as an Electrical Supervisor issued under regulation 49;

“extra high voltage” means a voltage normally exceeding 230,000 volts;

“extra low voltage” means a voltage normally not exceeding 50 volts alternating current or 120 volts direct current, whether between conductors or between conductor and earth;

“final circuit” means a circuit connected directly to current-using equipment, or to a socket outlet or other outlet points, for the connection of the equipment;

“foreign conformity assessment body” means a conformity assessment body who has its place of business in a country other than Malaysia and where the country has entered into a mutual recognition agreement with Malaysia;

“Grid-Connected Photovoltaic System Designer” means a person who holds a

Certificate of Competency as a Grid-Connected Photovoltaic System Designer issued under regulation 50;

“high voltage” means a voltage normally exceeding 50,000 volts but equal to or not exceeding 230,000 volts;

“line conductor” means a conductor forming part of an aerial line;

“local conformity assessment body” means a conformity assessment body who has its place of business in Malaysia and is registered with the Commission in accordance with regulation 102;

“low voltage” means a voltage normally exceeding extra low voltage but not exceeding 1,000 volts alternating current or 1,500 volts direct current between conductors, or 600 volts alternating current or 900 volts direct current between conductor and earth;

“Malaysian Communications and Multimedia Commission” means the

Commission established under the Malaysian Communications and

Multimedia Commission Act 1998 [Act 589];

“medium voltage” means a voltage normally exceeding low voltage but equal to or not exceeding 50,000 volts;

15

“multiple-earth neutral” means a neutral line conductor which is earthed at more than one point;

“mutual recognition agreement” means any agreement or arrangement between the state and any other country;

“neutral conductor” means a conductor connected to the neutral point of a system and contributing to the transmission of electrical energy;

“occupier” means the person occupying any premises and includes the person having the charge, management or control thereof either on his own account or as an agent of another person, but does not include a lodger;

“Off-Grid Photovoltaic System Designer” means a person who holds a

Certificate of Competency as an Off-Grid Connected Photovoltaic System

Designer issued under regulation 51;

“owner” means the owner or lessee of an installation, and includes, where the owner or lessee is absent, his authorized agent;

“person” includes any individual, firm, company, association, partnership or body of persons, whether incorporated or otherwise;

“phase conductor” means a conductor of an alternating current system for the transmission of electrical energy, other than a neutral conductor;

“portable apparatus” means an apparatus so constructed that it may be readily moved from place to place and be safely operated without any structural alteration following the removal;

“Private Wiring Unit” means a person who holds a Certificate of Registration as a Private Wiring Unit issued under regulation 83;

“registered installation” means an installation for which a valid Certificate of Registration has been issued under regulation 3;

“resident Competent Electrical Engineer” means a Competent Electrical

Engineer who is engaged on a full-time basis to be responsible for a particular installation;

“residual current device” means a mechanical switching device or an association of devices intended to cause the opening of the contacts when the

16

residual current attains a given value under specified conditions;

“service line” means an electric supply line through which electricity is, or is intended to be, supplied to one consumer or a group of consumers from a distributing main or immediately from a generating station or substation;

“substation” means any premises or enclosed part thereof which contains apparatus for either transforming or converting electricity to or from high voltage (other than transforming or converting electricity solely for the operation of switching devices or instruments) or for switching, controlling or regulating electricity at high voltage and which is large enough to admit the entrance of a person after the apparatus is in position, and includes the apparatus therein;

“switchboard” means an assembly of switchgear with or without instruments, but does not apply to a group of local switches in a final circuit;

“Switchboard Manufacturer” means a person who holds a Certificate of

Registration as a Switchboard Manufacturer issued under regulation 95;

“switchgear” means an assembly of main and auxiliary switching apparatus for operation, regulation, protection or other control of electrical installations;

“telecommunication line” means a wire or wires and any appliances or any apparatus connected to it used for the purpose of communications as defined under the Communications and Multimedia Act 1998 [Act 589];

“transformer” means an apparatus without continuously moving parts which by electromagnetic induction transforms alternating voltage or current in one winding into alternating voltage or current in one or more other windings, usually at different values of voltage or current, and includes an auto-transformer; and

“Wireman” means a person who holds a Certificate of Competency as a

Wireman issued under regulation 53.

17

Part II

PART II

INSTALLATION

Suggest a correction

Registration of Installation

Application for registration of installation

(2)

The Certificate of Registration shall be in Form B as prescribed in the First

Schedule.

Fee for registration of installation

Inspection and test of installation

18

Fee for inspection and test of installation

Register

Cancellation of Certificate of Registration of installation

Commission pursuant to subregulation (1) the person to whom the Certificate was issued shall return it to the Commission within fourteen days after being notified in writing of the cancellation.

Licence for Installation

Licence for a public installation

19

deems fit and appropriate for the public installation.

Licence for a private installation

Schedule.

Fee for public or private installation

Schedule.

Supervision and Test of Installation

Approval for commencement of wiring

Provided that no approval is necessary for an extension to an existing wiring of a domestic installation where the total current consumed at any one time by the said installation, as a result of the extension, does not exceed the maximum current demand as agreed upon in the supply contract between the owner and the licensee.

20

Supervision and completion of installation

Phase Restriction or Three Phase Restriction, and upon completion of the installation, the Wireman shall certify a Supervision and Completion Certificate.

Wireman with Three Phase Restriction, and upon completion of the installation, the

Wireman shall certify a Supervision and Completion Certificate.

Test of installation

Wireman with Single Phase Restriction or a Wireman with Three Phase Restriction authorized to test any installation, and who shall certify a Test Certificate for the installation.

Wireman with Three Phase Restriction authorized to test any installation, and who shall certify a Test Certificate for the installation.

Services Engineer, employed on a full-time basis by an Electrical Services Contractor and who shall certify a Test Certificate for the installation.

Supervision and Completion Certificate and Test Certificate

21

regulations 13 and 14 shall be in Forms G and H respectively as prescribed in the

First Schedule.

Certificate and Test Certificate has been submitted by the owner or management of the installation to the licensee.

Material, Equipment and Method of Installation

Apparatus, conductor, accessory, etc.

Switch, switchfuse, fuse switch, circuit breaker, contactor, fuse, etc.

22

position;

(a)

constructed and arranged in such a manner so as to break the current when it exceeds a given value for a sufficient time to prevent danger; and

Generator, motor, transformer, etc.

23

Means of isolation

Installation of Switchboard

Arrangement of switchboard in general

24

Working on a switchboard

25

Switchboard operating at high or extra high voltage

Suggest a correction

(a)

the conductor which is within the natural reach of a person standing on the working platform or in any switchboard passage way shall be placed or protected adequately to prevent danger;

Suggest a correction

(b)

the metallic frame of any instrument shall be earthed; and

Suggest a correction

(c)

the metal handle of a switch and any metal gear for operating the switch shall be earthed.

Underground Supply Line

Underground mains and connections

Joint, connection or termination

Jointer.

26

Portable Apparatus

Portable apparatus in general

27

Portable apparatus on a dredge or floating structure

Installation of Electric Sign

Electric sign

28

Fireman’s switch, notice and transformer

“OFF” position at the top and all letterings shall be legible to a person standing on the ground;

29

Steps to be taken by owner or management

Other Installations

Installation not in use

30

Power of Commission to make adjustment or alteration to installation

Installation for electric smelting, X-ray, etc.

Installation in a place of public entertainment

31

Installation on a dredge or floating structure

32

Earthing of Installation

Earthing of metallic part, neutral point, etc.

Method of earthing

Protection against earth leakage current

33

earth leakage current shall be afforded for any final circuit supplying electricity to an equipment which is intended to provide service to the public or which is intended to be accessible to, used by or operated by the public by a residual current device having a rated residual operating current not exceeding 10 milliamperes.

Suggest a correction
Suggest a correction

(1)

, (2) and (3), protection against earth leakage current shall be afforded for any final circuit, either individually or in a group, by a residual current device having a rated residual operating current not exceeding 100 milliamperes unless —

General Requirements of Installation

Room for switchboard or equipment

34

Notice millimetres wide and 240 millimetres high with the lettering in black on a white background, and the words “DILARANG MASUK” shall be inscribed in capital letters in the middle, the inscription being 290 millimetres long and 30 millimetres high and the spacing of letters being 6 millimetres wide.

millimetres wide and 350 millimetres high with the lettering in red on a white background, and at the top it shall bear a line of three conventional thunderbolts each 80 millimetres high and 6 millimetres wide at the broadest part, and below these the word “BAHAYA” shall be inscribed in capital letters, the inscription being 190 millimetres long and 28 millimetres high and the spacing of letters being 6 millimetres wide.

Instructions for treatment of electric shock

35

Fire extinguishers

Installation of Aerial Line

General conditions of aerial line millimetres of the ground wherever situated, shall be effectively earthed at each support or connected to a continuous overhead earth conductor which shall be effectively earthed at not less than four points in every 1.61 kilometres.

36

kilometres per hour at right angles to the line and this is wind to be taken as exerting a pressure equivalent to 0.05 gram per square millimetre calculated on the whole of the projected area of the lines.

37

Ground Clearance in Metres

System Voltage between conductors

Over roads

Other than over roads

In positions inaccessible to vehicular traffic

Not exceeding 600 volts 5.49 5.18 4.57

Exceeding 600 volts but not exceeding 11,000

volts 5.79 5.49 4.88

Exceeding 11,000

volts but not exceeding 66,000 volts 6.10 6.10 5.18

Exceeding 66,000

volts but not exceeding 132,000 volts 6.70 6.70 5.79

Exceeding 132,000

volts but not exceeding 275,000 volts 7.00 7.00 7.00

Exceeding 275,000

volts 7.30 7.30 7.30

38

any of the lower voltage line conductors or auxiliary earth conductors except with the written permission of the Commission.

Suggest a correction

(20)

, (21), (22), (23) and (24) and conforms with any instruction issued from time to time by the Commission or the relevant authority, as the case may be.

Aerial line operating at low voltage

39

(i)

in a case where metal poles are used, an earthed wire running from pole to pole and connected to the pole shall be used; or

(ii)

in a case where wooden or concrete poles are used, a bonding wire connected to the supporting metalwork of all insulators and terminating at the lowest point shall be used; and

Suggest a correction

(iii)

in all cases, the neutral shall be the lowest conductor of an aerial line;

Malaysian Communication and Multimedia Commission;

Aerial line operating at high or extra high voltage

40

Suggest a correction
Suggest a correction
Suggest a correction

(23)

, (24) and (25) and the Commission may in special circumstances exempt the owner, management or licensee of the installation, as the case may be, from having to comply with this subregulation;

Suggest a correction

(22)

, (23), (24) and (25) and conforms to any instruction issued from time to time by the Commission or Malaysian Communications and Multimedia

Commission;

and (4) shall be fixed at each support or structure where an aerial line is erected along or across a road, canal, navigable river or railway or crosses over any other overhead conductor;

41

Provided that the distance of 183 metres may be increased or reduced by the Commission after considering the voltage to be used and all circumstances generally affecting each particular case;

Commission; and

Suggest a correction

Part III

PART III

OPERATION

Suggest a correction

Examination for Competent Persons

Requirement for Certificate of Competency

Supervisor, Grid-Connected Photovoltaic System Designer, Off-Grid Photovoltaic

System Designer, Chargeman, Wireman or Cable Jointer referred to in these

Regulations shall possess a valid Certificate of Competency appropriate to such category, with restrictions, if any, issued to him by the Commission under these

Regulations.

Application for examination

Commission who shall decide whether the applicant is eligible under these

42

Regulations to sit for the examination.

Eligibility to become Electrical Services Engineer

Engineer issued under these Regulations;

Engineer shall be based on a syllabus to be determined by the Commission and shall

43

be conducted partly by written answers to questions set and partly by viva voce.

Eligibility to become Competent Electrical Engineer

Certificate of Competency as a Competent Electrical Engineer, shall satisfy the

Commission that he complies with the following conditions:

Registration of Engineers Act 1967 [Act 138];

(f)

that he is able to speak and write in the national language; and

44

Engineer shall be based on a syllabus to be determined by the Commission and shall be conducted partly by written answers to questions set and partly by viva voce.

Eligibility to become Electrical Supervisor

Certificate of Competency as an Electrical Supervisor, shall satisfy the Commission that he complies with the following conditions:

45

Eligibility to become Grid-Connected Photovoltaic System Designer

Certificate of Competency as a Grid-Connected Photovoltaic System Designer, shall satisfy the Commission that he complies with the following conditions:

Diploma in electrical engineering or electrical and electronics engineering from a recognised institution;

Grid-Connected Photovoltaic System Installation;

Suggest a correction

(f)

that he is able to speak and write in the national language; and

46

shall satisfy the Commission that —

Photovoltaic System Designer shall be based on a syllabus to be determined by the

Commission and shall be partly by written answers to questions set and partly by viva voce and may include such practical tests as the Commission deems necessary.

Eligibility to become Off-Grid Photovoltaic System Designer

Certificate of Competency as an Off-Grid Photovoltaic System Designer, shall satisfy the Commission that he complies with the following conditions:

47

Designer is issued to a person, he shall attend an interview conducted by the

Commission and shall satisfy the Commission that —

System Designer shall be based on a syllabus to be determined by the Commission and shall be partly by written answers to questions set and partly by viva voce and may include such practical tests as the Commission deems necessary.

Eligibility to become Chargeman

Certificate of Competency as a Chargeman, shall satisfy the Commission that he complies with the following conditions:

48

environment where electrical equipment is in operation and has had experience of controlling live equipment;

Commission that —

Eligibility to become Wireman

Certificate of Competency as a Wireman, shall satisfy the Commission that he complies with the following conditions:

Commission;

49

Contractor or Private Wiring Unit or any recognised academic institution or Government department or agency;

Suggest a correction

(f)

that he is able to comply with any other conditions as the Commission deems necessary.

Eligibility to become Cable Jointer

Certificate of Competency as a Cable Jointer, shall satisfy the Commission that he complies with the following conditions:

50

Suggest a correction

(f)

that he is able to comply with any other conditions as the Commission deems necessary.

Commission that he understands the jointing, connecting and terminating of various types of cables which are likely to come under his charge and has sufficient knowledge to carry out the work.

Temporary registration of foreign person

Part VI of the Second Schedule, issue a temporary Certificate of Competency as a competent person to any foreign person.

Sabah; and

51

Electrical Engineer, he shall be registered temporarily as a Professional Engineer in Electrical Engineering with the Board of Engineers under the Registration of

Engineers Act 1967 [Act 138].

Medical evidence of fitness

Certificate of Competency is issued to him.

Fee for processing examination application, examination, endorsement, replacement and reissuance of Certificate of Competency

52

Restriction or endorsement of Certificate of Competency

Suggest a correction

(a)

restrict the use of a Certificate of Competency of any Electrical

Services Engineer, Competent Electrical Engineer, Electrical

Supervisor, Grid-Connected Photovoltaic System Designer, Off-Grid

Photovoltaic System Designer, Chargeman, Wireman or Cable Jointer to any type, class, duration or location of installation;

Suggest a correction

(b)

endorse a Certificate of Competency for a Wireman with Single Phase

Restriction or a Wireman with Three Phase Restriction to authorize him to test and certify the wiring of any Single Phase or Three Phase installation, respectively, operating at low voltage on the condition that he has shown sufficient knowledge and experience in carrying out the work to the satisfaction of the Commission; or

Suggest a correction

(c)

endorse a Certificate of Competency for a Wireman with Three

Phase Restriction to authorize him to carry out any electric sign installation on the condition that he has shown sufficient knowledge and experience in carrying out the work to the satisfaction of the

Commission.

Competency issued under these Regulations as the Commission deems necessary.

Form of Certificate of Competency

Photovoltaic System Designer, an Off-Grid Photovoltaic System Designer, a

Chargeman, a Wireman and a Cable Jointer shall be in Forms J, K, L, M, N, O, P and Q respectively as prescribed in the First Schedule.

Surrender of Certificate of Competency issued under any other written law

53

Regulations.

Lost or damaged Certificate of Competency

Suspension and revocation of Certificate of Competency

Enactment or on consideration of a judgment of a court or a finding in an enquiry of death held under the Criminal Procedure Code, if it appears necessary to the

Commission so to do, suspend for such period as the Commission may decide or revoke absolutely any Certificate of Competency issued under these Regulations.

Competency issued under these Regulations in a case of serious misconduct.

54

Certificate of Competency has committed an offence under the Enactment or these

Regulations or any misconduct under these Regulations and is no longer fit to hold the Certificate of Competency the Commission shall forthwith suspend the

Certificate.

Certificate, appoint a Committee consisting of the Chairman of the Commission and two other persons appointed by the Chairman of the Commission to enquire into the alleged offence or misconduct.

Certificate of Competency issued under these Regulations.

55

Certificate of Competency.

Competent Person

Competent person

(iii)

a resident Competent Electrical Engineer; and volts, a resident Competent Electrical Engineer.

Competent Electrical Engineer or Electrical Supervisor, as the case may be, in

56

subregulation (1) shall —

Competent person responsible for a public installation

Competent person on each shift

Registration of competent person

Regulations and who does any work, act or thing under these Regulations in relation to his Certificate of Competency shall register himself with the Commission.

Certificate of Competency issued under regulation 55, shall be valid for a period of not less than one year and not more than five years on payment of the fees as

57

prescribed in Part VIII of the Second Schedule.

Engineer, Competent Electrical Engineer or Electrical Supervisor shall not do any work, act or thing under these Regulations which a person is allowed to do as a holder of such Certificate of Competency if he is more than 75 years of age.

Cable Jointer shall not do any work, act or thing under these Regulations which a person is allowed to do as a holder of such Certificate of Competency if he is more than 65 years of age.

Competent person to connect switchboard, equipment, etc.

58

fitting or apparatus designed to be connected to an electrical socket outlet by means of a plug, shall be connected to an installation for the purpose of receiving electricity unless the connection is carried out by or under the control of a competent person.

Competent persons to submit plans, drawings and specifications

Regular Inspection by Competent Person

Installation to be visited and inspected by competent person

Competent person and frequency of visit and inspection

Suggest a correction

(ii)

the Competent Electrical Engineer.

59

Provided that in a place of public entertainment the frequency of inspection for the installation referred to in paragraph (a) shall be at least two inspections per month:

Provided further that the Commission may determine —

Suggest a correction
Suggest a correction

(B)

where he is satisfied that the installation is safe and reasonably secured, the number of inspections for the installation by a competent person shall be less than that prescribed in paragraph

Suggest a correction

(a)

, (b) or (c).

Duty of Engineer or Supervisor to inspect and report

Electrical Supervisor who is required to inspect an installation under regulation 70 shall inspect the installation and shall record and direct all findings, recommendations and instructions to the Commission and the owner, management or licensee of the installation, as the case may be.

Supervisor shall submit to the owner, management or licensee of the installation, as the case may be, an inspection report of his findings, recommendations and instructions on the installation within one week of the inspection.

60

Supervisor shall submit to the Commission an Inspection Certificate as prescribed in Form I of the First Schedule within one week of the inspection of the installation.

Commission to determine number of visits

Engineer or Electrical Supervisor for the purpose of inspection of any installation as provided in regulation 70.

Duty to inform and to make good defects

Supervisor inspecting an installation referred to in subregulation 70(2), and being aware of any defect in the installation or any equipment therein which is likely to cause danger shall forthwith inform the owner, management or licensee of the installation to make good or remove the defects, and make a report immediately to the Commission.

Registration of Electrical Services Contractor

Electrical Services Contractor

Electrical Services Contractor issued under these Regulations.

61

Form R as prescribed in the First Schedule and shall be valid for a period of not less than one year and not more than five years from the date of issue of renewal of the Certificate of Registration.

Requirements for registration as an Electrical Services Contractor

Ordinance 1949 [Cap. 144] or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Services Engineer;

Social Security Act 1969 [Act 4]; and

Information required for registration as an Electrical Services Contractor

Services Contractor, the Commission shall require the person to submit the following information:

62

Fee for Certificate of Registration as an Electrical Services Contractor

Contractor and the renewal thereof at the rate prescribed in Part X of the Second

Schedule.

Registration of Electrical Contractor

Electrical Contractor

Regulations.

Requirements for registration as an Electrical Contractor

Ordinance 1949 [Cap. 144] or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Social Security Act 1969 [Act 4]; and

63

Information required for registration as an Electrical Contractor

Contractor, the Commission shall require the person to submit the following information:

Classification of Electrical Contractors

Suggest a correction

(e)

Class PV.

Phase Restriction, and nothing in this paragraph prohibits him to be one of the three Wiremen;

Phase Restriction authorized to test an installation, and nothing in this paragraph prohibits the Wireman from being one of the three Wiremen with Three Phase Restriction as provided in paragraph (b); and

64

Restriction, and nothing in this paragraph prohibits him to be one of the two Wiremen.

Restriction, and nothing in this paragraph prohibits him to be one of the two Wiremen;

Phase Restriction authorized to test an installation, and nothing in this paragraph prohibits the Wireman from being one of the two Wiremen with Three Phase Restriction as provided in paragraph (b); and

Phase Restriction, and nothing in this paragraph prohibits him to be the

Wireman.

Phase Restriction, and nothing in this paragraph prohibits him to be the

Wireman; and

Restriction authorized to test an installation, and nothing in this paragraph prohibits the Wireman from being the same person as the Wireman with

Three Phase Restriction as provided in paragraph (b).

Phase Restriction, and nothing in this paragraph prohibits him to be the

Wireman;

65

Phase Restriction authorized to test an installation, and nothing in this paragraph prohibits him to be the Wireman; and

Photovoltaic System Designer registered with the Commission, and nothing in this subparagraph prohibits him to be the Grid-Connected

Photovoltaic System Designer; and

(ii)

has employed on a full-time basis one Wireman with Three Phase

Restriction authorized to test an installation and who has passed any training on Installation of Grid-Connected Photovoltaic System for Wireman as approved by the Commission, and nothing in this subparagraph prohibits him to be the Wireman; and

Suggest a correction

(ii)

has employed on a full-time basis at least one Off-Grid Photovoltaic

System Designer registered with the Commission, and nothing in this subparagraph prohibits him to be the Off-Grid Photovoltaic

System Designer.

Fee for registration as an Electrical Contractor

66

Registration of Private Wiring Unit

Private Wiring Unit

Requirements for registration as a Private Wiring Unit

Suggest a correction
Suggest a correction

(a)

the person has registered his business under the Trades Licensing

Ordinance 1949 [Cap. 144] or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Suggest a correction

(b)

the person employs on a full-time basis a Wireman with Three Phase

Restriction, and nothing in this paragraph prohibits him to be the

Wireman;

Suggest a correction

(c)

the person employs on a full-time basis at least one Wireman with

Three Phase Restriction authorized to test an installation, and nothing in this paragraph prohibits the Wireman in paragraph (b) from being the Wireman under this paragraph;

Suggest a correction

(d)

the person has insurance coverage for his employees under the

Employees’ Social Security Act 1969 [Act 4]; and

Suggest a correction

(e)

the person is in possession of suitable equipment, testing equipment and instruments related to his work to be determined by the

Commission.

67

Information required for registration as a Private Wiring Unit

Wiring Unit, the Commission shall require the person to submit the following information:

Fee for registration as a Private Wiring Unit

Registration of Electrical Sign Contractor

Electrical Sign Contractor

U as prescribed in the First Schedule and shall be valid for a period of not less than one year and not more than five years from the date of issue or renewal of the

Certificate of Registration.

68

Requirements for registration as an Electrical Sign Contractor

Ordinance 1949 [Cap. 144] or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Phase Restriction authorized to carry out electric sign work, and nothing in this paragraph prohibits him to be the Wireman;

Phase Restriction authorized to test an installation, and nothing in this paragraph prohibits the said person, the Wireman with Three Phase

Restriction as in paragraph (b) and the Wireman with Three Phase

Restriction endorsed to test an installation to be the one and the same person;

Social Security Act 1969 [Act 4]; and

Information required for registration as an Electrical Sign Contractor

Sign Contractor, the Commission shall require the person to submit the following information:

69

Fee for Certificate of Registration as an Electrical Sign Contractor

Contractor and the renewal thereof at the rate prescribed in Part XIII of the Second

Schedule.

Registration of Electrical Repair Contractor

Electrical Repair Contractor

Certificate of Registration as an Electrical Repair Contractor issued under these

Regulations.

Form V as prescribed in the First Schedule and shall be valid for a period of not less than one year and not more than five years from the date of issue or renewal of the Certificate of Registration.

Requirements for registration as an Electrical Repair Contractor

Suggest a correction

(a)

the person has registered his business under theTrades Licensing

Ordinance 1949 [Cap. 144]or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Suggest a correction

(b)

the person employs on a full-time basis a skilled person with sufficient experience in the repair and service of electrical appliances, and nothing in this paragraph prohibits him to be the skilled person;

Suggest a correction

(c)

the person has insurance coverage for his employees under the

Employees’ Social Security Act 1969 [Act 4]; and

70

Suggest a correction

(d)

the person is in possession of suitable equipment, testing equipment and instruments related to his work to be determined by the Commission.

Information required for registration as an Electrical Repair Contractor

Repair Contractor, the Commission shall require the person to submit the following information:

Fee for Certificate of Registration as an Electrical Repair Contractor

Contractor and renewal thereof at the rate prescribed in Part XIV of the Second

Schedule.

Registration of Switchboard Manufacturer

Switchboard Manufacturer

Certificate of Registration.

71

Requirements for registration as a Switchboard Manufacturer operating at low voltage

Suggest a correction

(a)

the person has registered his business under the Trades Licensing

Ordinance 1949 [Cap. 144] or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Suggest a correction

(b)

the person employs on a full-time basis at least one Wireman with Three

Phase Restriction, and nothing in this paragraph prohibits him to be the

Wireman;

Suggest a correction

(c)

the person employs on a full-time basis at least one Chargeman with the relevant restriction to be determined by the Commission, and nothing in this paragraph prohibits the person, the Chargeman and the Wireman with Three Phase Restriction as in paragraph (b) to be one and the same person;

Suggest a correction

(d)

the person has insurance coverage for his employees under the

Employees’ Social Security Act 1969 [Act 4]; and

Suggest a correction

(e)

the person is in possession of suitable equipment, test equipment and instruments for testing of the switchboard.

Requirements for registration as a Switchboard Manufacturer operating at low voltage and higher than low voltage

Ordinance 1949 [Cap. 144]or is a company registered or incorporated under the Companies Act 2016 [Act 777];

Phase Restriction, and nothing in this paragraph prohibits him to be the

Wireman;

72

Social Security Act 1969 [Act 4]; and

Suggest a correction

(f)

the person is in possession of suitable equipment, test equipment and instruments for testing of the switchboard.

Information required for registration as a Switchboard Manufacturer

Manufacturer the Commission shall require the person to submit the following information:

Fee for Certificate of Registration as a Switchboard Manufacturer

Manufacturer and the renewal thereof at the rate prescribed in Part XV of the Second

Schedule.

73

Approval of Equipment

Certificate of Approval for equipment

Certificate of Approval of any equipment.

Recognition of foreign conformity assessment body

Commission shall give a recognition to a foreign conformity assessment body, in a manner that may be determined by the Commission:

Provided that, the foreign conformity assessment body shall be recognised, registered or licensed by the relevant authority in the country in which the foreign conformity assessment body carries on its business.

74

Registration of local conformity assessment body

Provided that, the local conformity assessment body has been accredited by the accreditation authority.

shall be issued with a Certificate of Registration as conformity assessment body as set out in Form X of the First Schedule.

Registration of manufacturer and importer

Form AA of the First Schedule.

75

Submission of test report or Certificate Conformity by manufacturer

Commission in accordance with this regulation.

Submission of test report or Certificate of Conformity by importer

76

recognised by the Commission and the report shall be valid for not less than one year and not exceeding five years from the date of the report.

Commission in accordance with this regulation.

Duties to keep technical files of equipment, etc.

Marking or labelling of approved equipment

Commission.

77

Samples of equipment to be delivered to Commission

Test and modification before approval

Submission for test and seizure of dangerous equipment

78

within such time as may be specified in the notice, samples of the equipment for an examination and a test thereof.

Efficient use of electricity by equipment

Certificate of Approval under regulation 100, any person who manufactures, imports, sells or offers for sale or lease any equipment under that regulation, shall ensure that such equipment meets the energy performance testing standards, the minimum energy performance standards and the efficiency ratings as set out in the

Fourth Schedule.

Energy performance testing report

Commission.

79

Submission for test and seizure for the purpose of efficient use of electricity

Renewal, Transfer, Cancellation, Removal and Reinstatement of Certificate

Renewal of Certificate of Registration

Transfer of Certificate of Registration

80

95, 102 or 103 shall be transferred by the holder of the Certificate to any other person except with the written permission of the Commission.

83, 87, 91, 95, 102 or 103 shall obtain approval from the Commission in writing for any change of name or address in connection with the business and the Certificate shall be amended or replaced without payment of any fee.

Cancellation of Certificate of Registration

Regulations; or

Suggest a correction

(e)

the holder of the Certificate has obtained the Certificate by making or causing to be made any false or fraudulent declaration, certification or representation, either in writing or otherwise.

Removal from and reinstatement to the Register of Certificate of Registration

83, 87, 91, 95, 102 or 103 —

81

Renewal of Certificate of Approval

Transfer of Certificate of Approval

82

Cancellation of Certificate of Approval

Removal from and reinstatement to the Register of Certificate of Approval

83

Market surveillance

Suggest a correction

Part IV

PART IV

MAINTENANCE

Suggest a correction

Maintenance of Installations

Inspection and test for the purpose of maintenance of installation, etc.

84

precautions shall be observed at all times to prevent danger.

Competent person to undertake maintenance work

Adequate safety precautions to be taken during work

85

Competent person to issue written instruction

Part V

PART V

MISCELLANEOUS

Suggest a correction

Authorized officer’s identity card

86

under subsection 70(1) of the Enactment shall be in Form F as prescribed in the

First Schedule.

Special order by Commission

Prohibition of use of equipment dangerous to health

Summons to assessor and witness

Form BB of the First Schedule.

CC of the First Schedule.

English language.

87

Fees payable to the Commission

Licensee to keep records

Fee for a copy of a report

Penalty

88

FIRST SCHEDULE

FORM A

[Subregulation 3(1)]

APPLICATION FOR REGISTRATION OF AN INSTALLATION

I/We……………………………………………………………………………..........

the owner of the installation …………………………………………………………

…………………………........……………………………………………………at

…………………………………….. hereby apply in accordance with section 28 of the

Electricity Supply Enactment 2024 for a Certificate of Registration for the installation.

The installation consists of the following apparatus:*

………………………….

Owner

*This list is to contain full details of the apparatus on which the fee is to be assessed as prescribed under regulation 4 in Part I of the Second Schedule with any other apparatus.

If the list is unduly long it may be given on a separate sheet or sheets of paper attached to this application.

89

FORM B

[Subregulation 3(2)]

CERTIFICATE OF REGISTRATION

INSTALLATION NO. : …………………………

The Commission hereby certifies in pursuance of section 28 of the Electricity Supply Enactment 2024 that the installation ................................................................................................at

………………………………………………..………………………………………… the property of ................................................................................................................. has satisfied the requirements of the Enactment and the Regulations made thereunder.

The Commission certifies that the above-mentioned installation has been registered and this Certificate of Registration shall be valid for a period of …………………………

year(s)* from the date of issue stated below.

Fee: RM……………………

Aggregate capacity installed: ..................... kilowatts

Date of issue: ………………………………….........

Place: …………………………………………….....

………………………….

Commission

*Not less than one year and not more than five years.

FORM C

[Subregulation 5(3)]

90

NOTICE OF INITIAL INSPECTION

To: ……………………………….................................................................................……

of …………………...............................................................................................................

The notice of completion of your installation at …………………….....…….................

...............................................................................................................................................

...............................................................................................................................................

has been received on the …………… day of ………………20… ......... You are hereby notified that, in accordance with section 28 of the Electricity Supply Enactment 2024, an inspection and test of the installation will be made on the …………… day of ……………

20 …………… at ............................ a.m./p.m. and that the person who is in charge of the installation is required to be present during the inspection and test and to give such assistance as may be required.

A fee of RM …………. shall be paid within .................. days of this Notice.

Date: ………………………

Place: …………………….

………………………….

Commission

FORM D

[Subregulation 5(3)]

91

NOTICE OF FOLLOW-UP INSPECTION

To: ……………………………………………………………………………………..……

of ……………………………………………………………………………………....….....

You are hereby notified that in accordance with section 28 of the Electricity Supply

Enactment 2024 an inspection and test of your installation at..............................................

...............................................................................................................................................

...............................................................................................................................................

will be made on the …………… day of …………… 20 …………… at ……………........

a.m./p.m. and that the person in charge of the installation is required to be present during the inspection and test and to give such assistance as may be required.

A fee of RM …………. shall be paid within ................. days of this Notice.

Date: ………………………

Place: …………………….

………………………….

Commission

92

Licence No.:

Serial No.:

FORM E

[Regulation 10]

LICENCE FOR PRIVATE INSTALLATION

In accordance with section 8 of the Electricity Supply Enactment 2024, the Commission, with the approval of the Minister, hereby grants a licence to ……………………………

…………………....................................................................................................................

…………………....................................................................................................................

of…………………………………………………………………………………..……..

to use, work and operate, in accordance with the Electricity Supply Regulations 2024, an electrical installation at………………………………………………………………………

for the supply and use of electricity solely to or on the property and premises of …………

……………………………............................................ subject to the following conditions:

(state)

Dated the …………… day of ……………… 20 …………..

Granted by

………………………….

Commission

93

FORM F

[Regulation 127]

NO.: ..........................

COMMISSION’S AUTHORIZED OFFICER’S IDENTITY CARD

Full Name: ........................................................................

Identity Card No.: ............................................................

Signature of Holder: .........................................................

Enactment 2024.

Enactment or any regulations made thereunder, enter any premises.

Date of issue:

………………………….

Commission

94

FORM G

[Subregulation 15(1)]

SUPERVISION AND COMPLETION CERTIFICATE

To: ……………………………………………………………………………..........………

(Name & Address of owner/management of installation) (see notes overleaf)

Client:

Address:

This installation is a/an new installation/addition/alteration to existing installation*

I, being the competent person responsible (as indicated by my signature below) for the supervision and completion of the electrical work in the installation described in Part 1, particulars of which are described in the Schedule of Drawings in Part 3, CERTIFY that such work for which I have been responsible is to the best of my knowledge and belief in accordance with the Electricity Supply Regulations 2024.

The extent of liability of the signatory is limited to the electrical work described in Part 1 of this Certificate.

For the supervision and completion of the electrical work:

Name (In Block Letters):

Certificate of Competency:

Wireman with Single/

Three Phase Restriction*

For and on behalf of:

Certificate of Competency No.:

Address:

Signature:

Date:

Part

PART 2: SUPERVISION AND COMPLETION

Each drawing listed below shall bear the following undertaking:

(e)

Electricity Supply Regulations 2024 shall be made out and signed by a competent person in respect of the supervision and completion of the electrical work.

Suggest a correction

Part

PART 3: SCHEDULE OF DRAWINGS

hereby confirm that the electrical work listed in this drawing has been supervised by me and completed in accordance with the Electricity Supply Regulations 2024.

Suggest a correction

Name:

Wireman with Single/Three Phase Restriction*

Type of Certificate of Competency:

Certificate of Competency No.:

For and on behalf of:

Address:

Signature:

Date:

96

Completion Certificate and Test Certificate (Forms G and H of the First Schedule)

to the licensee in order to receive electricity from the licensee.

*Delete whichever is not applicable.

97

FORM H

[Subregulation 15(1)]

TEST CERTIFICATE

To: …………………………………………………………………………………………

(Name & Address of owner/management of installation) (see notes overleaf)

Client:

Address:

This installation is a/an new installation/addition/alteration to existing installation*

I, being the competent person responsible (as indicated by my signature below) for the testing of the installation described in Part 1, particulars of which are described in the

Schedule of Drawings in Part 3 and Schedule of Test Results in Part 4, CERTIFY that the installation for which I have been responsible is to the best of my knowledge and belief in accordance with the Electricity Supply Regulations 2024 and that such installation is ready and safe to receive electricity from or be given electricity by the licensee.

The extent of liability of the signatory is limited to the installation described in Part 1

of this Certificate.

For the Test of the installation:

Name (In Block Letters):

Type of Certificate of Competency:

For and on behalf of:

Certificate of Competency No.:

Address:

Signature:

Date:

Part

PART 2: TEST

Each drawing listed below shall bear the following undertaking:

(d)

Paragraph

hereby confirm that the electrical work listed in this Drawing has been tested by me in accordance with the Electricity Supply Regulations 2024.

Suggest a correction

Name:

Type of Certificate of Competency:

Certificate of Competency No.:

For and on behalf of:

Address:

Signature:

Date:

Suggest a correction

Part

PART 4: SCHEDULE OF TEST RESULTS

Completion Certificate and Test Certificate (Forms G and H of the First Schedule)

Suggest a correction

to the licensee in order to receive electricity from the licensee.

*Delete whichever is not applicable.

100

FORM I

[Subregulation 71(4)]

INSPECTION CERTIFICATE

To: …………………………………………………………………………………………

(Commission) (see notes overleaf)

Client:

Address:

No. of Shifts:

Voltage:

Ampere:

I, being the competent person responsible (as indicated by my signature below) for the visit and inspection of the installation described in Part 1, CERTIFY that such installation for which I am responsible and have visited and inspected on ...................................... is to the best of my knowledge and belief in accordance with the Electricity Supply Regulations 2024 except for the defects and departures, if any, stated in Part 3 of this Certificate.

The installation is safe for its operation.

The extent of liability of the signatory is limited to the installation described in Part 1

of this Certificate.

For the Visit and Inspection of the installation:

Name (In Block Letters):

Type of Certificate of Competency:

For and on behalf of:

Certificate of Competency No.:

Address:

Signature:

Date:

Part

PART 2: VISIT AND INSPECTION OF INSTALLATION

(d)

Regulations 2024 shall be made out and signed by a competent person in respect of the visit and inspection of the installation.

Suggest a correction

Part

PART 3: DEFECTS AND DEPARTURES

Certificate No.:

Suggest a correction

FORM J

[Regulation 59]

CERTIFICATE OF COMPETENCY AS AN ELECTRICAL SERVICES ENGINEER

................................................................................................................................................

(Name)

Identity Card No.: .................................................. Date of Birth: .......................................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as an Electrical Services Engineer is issued to him and shall not be used by any other person.

…………………………

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

104

FORM K

[Regulation 59]

CERTIFICATE OF COMPETENCY AS A COMPETENT ELECTRICAL ENGINEER

..............................................................................................................................................

(Name)

Identity Card No.: ................................................... Date of Birth: .......................................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as a Competent Electrical Engineer is issued to him and shall not be used by any other person.

………………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

FORM L

[Regulation 59]

105

CERTIFICATE OF COMPETENCY AS AN ELECTRICAL SUPERVISOR

..............................................................................................................................................

(Name)

Identity Card No.: ................................................................ Date of Birth: ..........................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as an Electrical Supervisor is hereby issued to him and shall not be used by any other person.

………………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

FORM M

[Regulation 59]

106

CERTIFICATE OF COMPETENCY AS A GRID-CONNECTED PHOTOVOLTAIC

SYSTEM DESIGNER

..............................................................................................................................................

(Name)

Identity Card No.: ................................................................ Date of Birth: ..........................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as a Grid-Connected Photovoltaic System Designer is hereby issued to him and shall not be used by any other person.

………………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

107

Certificate No.:

FORM N

[Regulation 59]

CERTIFICATE OF COMPETENCY AS AN OFF-GRID PHOTOVOLTAIC SYSTEM

DESIGNER

..............................................................................................................................................

(Name)

Identity Card No.: ................................................................ Date of Birth: ..........................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as an Off-Grid Photovoltaic System Designer is hereby issued to him and shall not be used by any other person.

…………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

108

Certificate No.:

FORM O

[Regulation 59]

CERTIFICATE OF COMPETENCY AS A CHARGEMAN

..............................................................................................................................................

(Name)

Identity Card No.: ............................................................. Date of Birth: .............................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as a Chargeman is hereby issued to him and shall not be used by any other person.

…………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

109

Certificate No.:

FORM P

[Regulation 59]

CERTIFICATE OF COMPETENCY AS A WIREMAN

................................................................................................................................................

(Name)

Identity Card No.: ................................................................ Date of Birth: ..............................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as a Wireman is hereby issued to him and shall not be used by any other person.

………………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

110

Certificate No.:

FORM Q

[Regulation 59]

CERTIFICATE OF COMPETENCY AS A CABLE JOINTER

..............................................................................................................................................

(Name)

Identity Card No.: ................................................................ Date of Birth: ...............................

having been examined and found to possess the qualifications prescribed by the Electricity

Supply Regulations 2024 made under the Electricity Supply Enactment 2024, this Certificate of Competency as a Cable Jointer is hereby issued to him and shall not be used by any other person.

………………………….

Commission

In the event of this Certificate coming into the possession of any person other than the person to whom it has been issued it shall be returned forthwith to the Commission.

111

FORM R

[Subregulation 74(3)]

CERTIFICATE OF REGISTRATION AS AN ELECTRICAL SERVICES CONTRACTOR

In accordance with regulation 74 of the Electricity Supply Regulations 2024, this Certificate is issued to .............................................................................................................................

(name of holder)

and authorizes the holder to carry on the business of electrical engineering services as an

Electrical Services Contractor ...............................................................................................

................................................................................................................................................

(address of business and branches)

to an approximate operational voltage of:

500

and above 275 132 66 33 11 0.415 *kilovolts for a period of................... year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

112

FORM S

[Subregulation 78(2)]

CERTIFICATE OF REGISTRATION AS AN ELECTRICAL CONTRACTOR

In accordance with regulation 78 of the Electricity Supply Regulations 2024, this Certificate is issued to ..............................................................................................................................

(name of holder)

and authorizes the holder to carry on the business of electrical work as an Electrical Contractor at..............................................................................................................................................

(address of business and branches)

under Class

A

B

C

D

PV

(Grid-Connected)

PV

(Off-Grid)

*

for a period of................... year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

113

FORM T

[Subregulation 83(2)]

CERTIFICATE OF REGISTRATION AS A PRIVATE WIRING UNIT

In accordance with regulation 83 of the Electricity Supply Regulations 2024, this Certificate is issued to ..............................................................................................................................

(name of holder)

and authorizes the holder to carry out wiring work as a Private Wiring Unit at ....................

................................................................................................................................................

................................................................................................................................................

................................................................................................................................................

(address of business and branches)

confined to within the boundary of the property of the owner for a period of ..................

year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

114

FORM U

[Subregulation 87(2)]

CERTIFICATE OF REGISTRATION AS AN ELECTRICAL SIGN CONTRACTOR

In accordance with regulation 87 of the Electricity Supply Regulations 2024, this Certificate is issued to ..............................................................................................................................

(name of holder)

and authorizes the holder to carry on the business as an Electrical Sign Contractor at ............

....................................................................................................................................................

..................................................................................................................................................

..................................................................................................................................................

(address of business and branches)

for a period of................... year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

115

FORM V

[Subregulation 91(2)]

CERTIFICATE OF REGISTRATION AS AN ELECTRICAL REPAIR CONTRACTOR

In accordance with regulation 91 of the Electricity Supply Regulations 2024, this Certificate is issued to ..............................................................................................................................

(name of holder)

and authorizes the holder to carry on the business of checking, servicing and repair of electrical appliances as an Electrical Repair Contractor at ....................................................

................................................................................................................................................

................................................................................................................................................

(address of business and branches)

for a period of................... year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

116

FORM W

[Subregulation 95(2)]

CERTIFICATE OF REGISTRATION AS A SWITCHBOARD MANUFACTURER

In accordance with regulation 95 of the Electricity Supply Regulations 2024, this Certificate is issued to ..............................................................................................................................

.................................................................................................................................................

................................................................................................................................................

(name of company or firm)

and authorizes the holder to carry on the business of manufacturing switchboards to an approximate operational voltage of:

33 11 0.600

*kilovolts as a switchboard manufacturer at ..........................................................................................

................................................................................................................................................

................................................................................................................................................

................................................................................................................................................

(address of company or firm and branches)

for a period of................... year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ....................................................

Date of expiry: .................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not exceeding five years.

117

FORM X

[Subregulation 102(2)]

CERTIFICATE OF REGISTRATION AS CONFORMITY ASSESSMENT BODY

The Commission hereby certifies in pursuance of section 3 of the Electricity Supply

Enactment 2024 that .............................................................................................................

at................................................................................................................................ has satisfied the requirements of the Enactment and the Regulations made thereunder.

The Commission certifies that the above-mentioned .......................................... has been registered and this Certificate of Registration shall be valid for a period of ...........................

year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ...................................................

Date of expiry: .................................................................

Place: ...............................................................................

Registration No.: ..............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete whichever is not applicable.

** Not less than one year and not exceeding three years.

118

FORM Y

[Subregulation 100(2)]

CERTIFICATE OF APPROVAL

In accordance with regulation 100 of the Electricity Supply Regulations 2024, this Certificate is issued to .............................................................................................................................

(name of importer)

at .............................................................................................................................................

(address)

and approval is given to —

import display1

sell advertise

*

the equipment the description of which are set out below direct from ..................................

.................................................................................................................................................

(name and country of manufacturer)

and the equipment is in compliance with:

for a period of .................... year(s)** from the date of issue/renewal* shown hereunder subject to the following conditions:

(state)

Date of issue/renewal*: ....................................................Expiry date: .............................

Approval No.: .................................................................... Fee RM: ....................................

Description of Equipment

Equipment: ..........................................................................................................................

Trade Name: .........................................................................................................................

Type/Model: ........................................................................................................................

119

Specification of Equipment

Voltage: ................................... Volts

Power: .................................. Watts

Frequency: ............................... Hz

Current: ................................. Amp

………………………….

Commission

1 Equipment approved is intended to be displayed only and not to be sold, installed or used.

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

120

FORM Z

[Subregulation 100(2)]

CERTIFICATE OF APPROVAL

In accordance with regulation 100 of the Electricity Supply Regulations 2024, this Certificate issued to .................................................................................................................................

(name of holder’s company)

at ...........................................................................................................................................

(address)

and approval is given to —

manufacture display1

sell advertise

*

the equipment, the description of which is set out below direct from ...................................

................................................................................................................................................

(name of manufacturer)

..................................................................................................................................................

(address of manufacturer)

and the equipment is in compliance with:

for a period of ................... year(s)** from the date of issue/renewal* shown hereunder subject to the following conditions:

(state)

Date of issue/renewal*: .................................................. Expiry date: ...........................

Approval No.: ..................................................................... Fee RM: ...................................

Description of Equipment

Equipment: ..........................................................................................................................

Trade Name: ........................................................................................................................

Type/Model: ........................................................................................................................

Specification of Equipment

Voltage: ................................... Volts

Power: .................................. Watts

Frequency: ............................... Hz

Current: ................................. Amp

………………………….

Commission 1 Equipment approved is intended to be displayed only and not to be sold, installed or used.

* Delete whichever is not applicable.

** Not less than one year and not more than five years.

121

FORM AA

[Subregulation 103(2)]

CERTIFICATE OF REGISTRATION TO MANUFACTURE/TO IMPORT*

The Commission hereby certifies in pursuance of paragraph 3(n) of the Electricity Supply

Enactment 2024 that .............................................................................................................

...................................................................................................................................................

at................................................................................................................... has satisfied the requirements of the Enactment and the Regulations made thereunder.

The Commission certifies that the above-mentioned ..............................................................

has been registered and this Certificate of Registration shall be valid for a period of ..........

year(s)** from the date of issue/renewal* shown below:

Date of issue/renewal*: ...................................................

Date of expiry: .................................................................

Place: ...............................................................................

Registration No.: .............................................................

Fee RM: ...........................................................................

………………………….

Commission

* Delete wherever appropriate.

** Not less than one year and not exceeding five years.

122

FORM BB

[Subregulation 130(1)]

SUMMONS TO AN ASSESSOR

To: ........................................................................................................................................

of ..........................................................................................................................................

Opening note

Preamble

Suggest a correction
  1. Whereas you have been nominated by the Minister of ... .. to serve as an assessor in an enquiry to be held under section 59 of the Electricity Supply Enactment 2024, you are hereby summoned to attend in person at the ... .. . office at
  2. . on the
  3. . day of ... .20 ... . at ... o’clock to serve in the capacity of an assessor in the enquiry and you are not to depart from thence without my leave.
  4. Given under my hand the ... . day of ... . 20 ... . Head of the Enquiry 123 FORM CC [Subregulation 130(2)] SUMMONS TO A WITNESS To: ... . of ...

Opening note

Preamble

Suggest a correction
  1. Whereas an enquiry is to be held under section 59 of the Electricity Supply Enactment 2024 in connection with ... and it appears to the person appointed by the Minister to lead the enquiry that you are likely to be able to give material evidence in respect of the following matter in question: You are hereby summoned under section 60 of the Enactment to appear before the person appointed by the Minister to lead the enquiry at the office at ... on the ... . day of ... . 20 ... . at ... . o’clock to testify what you know concerning the matter in question and you are not to depart from the office without my leave. Given under my hand the ... . day of ... . 20 ... . Head of the Enquiry 124 SECOND SCHEDULE

[Regulation 4]

Suggest a correction

FEES FOR THE ISSUANCE OF CERTIFICATE OF REGISTRATION

Section 1

Fees according to the following rates are payable for the issuance of Certificate of

Open as pageSuggest a correction

Registration under regulation 4:

Installation

Capacity

Annual Fee (RM)

1 year 2 years 3 years 4 years 5 years

(a)

for each installation of 10 kilowatts or less 30 60 90 120 150

Suggest a correction

(b)

for each installation above 10 kilowatts to 50 kilowatts 165 330 495 660 825

Suggest a correction

(c)

for each installation above 50 kilowatts to 100 kilowatts 550 1,100 1,650 2,200 2,750

Suggest a correction

(d)

for each installation above 100

kilowatts to 300

kilowatts 1,100 2,200 3,300 4,400 5,500

Suggest a correction

(e)

for each installation above 300

kilowatts to 600

kilowatts 1,650 3,300 4,950 6,600 8,250

Suggest a correction

(f)

for each installation above 600

kilowatts to 5,000

kilowatts 2,200 4,400 6,600 8,800 11,000

Suggest a correction

(g)

for each installation above 5,000

kilowatts 3,000 6,000 9,000 12,000 15,000

Suggest a correction

Section 2

Open as pageSuggest a correction

For the purpose of this Part, “installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

[Subregulation 11(3)]

Suggest a correction

FEES FOR THE ISSUANCE OF A LICENCE FOR A PRIVATE INSTALLATION

Section 1

Suggest a correction

Fees according to the following rates are payable for the issuance of a licence for a private installation under subregulation 11(3):

Installation Capacity

(a)

for each installation of 10 kilowatts or less 30

Suggest a correction

(b)

for each installation above 10 kilowatts to 50 kilowatts 165

Suggest a correction

(c)

for each installation above 50 kilowatts to 100 kilowatts 550

Suggest a correction

(d)

for each installation above 100 kilowatts to 300 kilowatts 1,100

Suggest a correction

(e)

for each installation above 300 kilowatts to 600 kilowatts 1,650

Suggest a correction

(f)

for each installation above 600 kilowatts to 5,000 kilowatts 2,200

Suggest a correction

(g)

for each installation above 5,000 kilowatts to 10,000 kilowatts 3,000

Suggest a correction

(h)

for each installation above 10,000 kilowatts to 15,000 kilowatts 10,000

Suggest a correction

(i)

for each installation above 15,000 kilowatts to 20,000 kilowatts 50,000

Suggest a correction

(j)

for each installation above 20,000 kilowatts to 25,000 kilowatts 100,000

Suggest a correction

(k)

for each installation above 25,000 kilowatts to 30,000 kilowatts 200,000

Suggest a correction

(l)

for each installation above 30,000 kilowatts to 35,000 kilowatts 300,000

Suggest a correction

(m)

for each installation above 35,000 kilowatts to 40,000 kilowatts 400,000

Suggest a correction

(n)

for each installation above 40,000 kilowatts to 45,000 kilowatts 500,000

Suggest a correction

(o)

for each installation above 45,000 kilowatts to 50,000 kilowatts 600,000

Suggest a correction

(p)

for each installation exceeding 50,000 kilowatts the fee will be based on flat

RM600,000 for the first 50,000 kilowatts and subsequent kilowatt will be based on RM5 per kilowatt

Suggest a correction

Section 2

Fees per year (RM)

Suggest a correction

For the purpose of this Part, “installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

[Regulation 6]

Suggest a correction

FEES FOR INSPECTION AND TEST OF INSTALLATION

Fees according to the following rates shall be charged for inspection and test of the following installations:

Installation Capacity

Fees per inspection and test (RM)

(a)

for each installation of 50 kilowatts or less 100

Suggest a correction

(b)

for each installation above 50 kilowatts to 100 kilowatts 150

Suggest a correction

(c)

for each installation above 100 kilowatts to 300 kilowatts 200

Suggest a correction

(d)

for each installation above 300 kilowatts to 600 kilowatts 300

Suggest a correction

(e)

for each installation above 600 kilowatts to 1,000 kilowatts 400

Suggest a correction

(f)

for each installation above 1,000 kilowatts 500

[Subregulation 11(1)]

Suggest a correction

FEES FOR PUBLIC INSTALLATION OTHER THAN GENERATION

REFERRED TO IN SUBREGULATION 11(2)

Suggest a correction

Section 1

Suggest a correction

The rates to determine the fees payable on an annual basis for the issuance of a licence for a public installation, other than the generation referred to in subregulation 11(2), is as follows:

(a)

before the commissioning of any part of the installation —

Suggest a correction

Section 1

Suggest a correction

1 cent per kilowatt based on the installation capacity as specified in the licence; and

(b)

after the whole installation or any part of it has been completed, commissioned and is ready to deliver electricity to any person:

Installation Capacity

Types of Activities

Generation

Transmission

Distribution

Where the aggregate power is 5 kilowatts and above

RM1.65/

kilowatt

RM0.33/

kilowatt

RM0.44/

kilowatt

For the purpose of determining the fees payable under this subparagraph, the capacity of the installation shall be —

Suggest a correction

(i)

where part of the installation has been completed, commissioned and is ready to deliver electricity to any person —

the maximum installation capacity commissioned during the relevant 12 months; or

(ii)

after the whole installation has been completed, commissioned and is ready to deliver electricity to any person —

the installation capacity as specified in the licence.

Suggest a correction
Suggest a correction

Section 2

Suggest a correction

Where two or more of the circumstances specified in subparagraph 1(a) or subsubparagraph 1(b)(i) or (ii) occur during the 12-month period from the date of issuance of the licence or during any subsequent 12-month period, the annual fees payable for the 12-month period shall be based on the circumstances in subparagraph 1(a) or subsubparagraph 1(b)(i) or (ii), whichever is the higher.

Section 3

Open as pageSuggest a correction

Any difference between the annual fees which have been paid and the annual fees, which is payable in accordance with paragraph 2 for the 12-month period, shall be paid within one month from the date of occurrence of the circumstances which require a higher fee to be paid.

5

Section 4

Open as pageSuggest a correction

In the calculation of the installation capacity, kilowatt (kW) is calculated as 0.85 x kilovolt-ampere (kVA).

Section 5

Open as pageSuggest a correction

For any licence issued before the date of coming into operation of this Part, the fees prescribed in this Part shall be applied on the date that the next annual fees are due and payable.

Section 6

Notwithstanding the foregoing paragraphs, the minimum fees payable under this

Open as pageSuggest a correction

Part is RM100.

Section 8

Open as pageSuggest a correction

A fee of RM100 shall be payable for an application to amend the conditions of the licence or to replace the licence. Any amendment to the conditions of the licence shall be subjected to such terms and conditions as the Commission may impose.

Section 9

For the purpose of this Part —

Open as pageSuggest a correction

“commissioned” means the inspection, tests and trial operations carried out on an equipment or installation or any part of it to verify and ascertain that the equipment or installation has been manufactured, fabricated, constructed, installed, set or adjusted according to the relevant safety, operational and performance requirements so that it is ready to be used, worked or operated; “distribution”

to include Electric Vehicle Charging Station; and

“installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

6

[Subregulation 11(2)]

Suggest a correction

FEES FOR PUBLIC INSTALLATION FOR GENERATING ELECTRICITY USING

BIOMASS, BIOGAS, HYDROPOWER, SOLAR POWER, GEOTHERMAL POWER,

WIND POWER, WAVES AND TIDES SOURCES WITH AGGREGATE POWER NOT

EXCEEDING 5 MEGAWATTS

Section 1

Suggest a correction

The rates to determine the fees payable on an annual basis for the issuance of a licence for a public installation for generating electricity using biomass, biogas, hydropower, solar power, geothermal power, wind power, waves and tides sources with aggregate power not exceeding 5 Megawatts (MW) shall be as follows:

(a)

before the commissioning of any part of the installation —

Suggest a correction

Section 1

Suggest a correction

1 cent per kilowatt based on the installation capacity as specified in the licence; and

(b)

after the whole installation or any part of it has been completed, commissioned and is ready to supply electricity to any person or utility —

RM1.65 for each kilowatt (kW) where the aggregate power of the installation capacity is more than 5 kW.

For the purpose of determining the fees payable under this subparagraph, the capacity of the installation shall be —

Suggest a correction

(i)

where part of the installation has been completed, commissioned and ready to supply electricity to any person or utility —

the maximum installation capacity commissioned during the relevant 12 months; or

(ii)

after the whole installation has been completed, commissioned and is ready to supply electricity to any person or utility —

the installation capacity as specified in the licence.

Suggest a correction
Suggest a correction

Section 2

In the calculation of the installation capacity, kilowatt (kW) is calculated as 0.85

Suggest a correction

x kilovolt-ampere (kVA).

Section 3

Suggest a correction

For any licence which has been issued before the date of coming into operation of this Part, the fees prescribed in this Part shall apply to the date the next annual fees are due and payable.

Section 4

Suggest a correction

A processing fee of RM100 shall be charged for an application of a licence.

Section 5

Suggest a correction

A fee of RM100 shall be payable for an application to amend the conditions of the

7

licence or to replace the licence. Any amendment to the conditions of the licence shall be subjected to such terms and conditions as the Commission may impose.

Section 6

For the purpose of this Part —

Suggest a correction

“commissioned” means the inspection, tests and trial operations carried out on an equipment or installation or any part of it to verify and ascertain that the equipment or installation has been manufactured, fabricated, constructed, installed, set or adjusted according to the relevant safety, operational and performance requirements so that it is ready to be used, worked or operated; and

“installation capacity” means the maximum level of electrical power at which an installation can be used, worked on or operated for a period of time without causing damage to any part of the installation. However, for a transmission or distribution system, the installation capacity is at the maximum level of electrical power at which the system is expected or required to supply over a period of time, whichever is the higher.

Part VI

PART VI

[Subregulation 55(1)]

Suggest a correction

FEES FOR ISSUANCE OF TEMPORARY CERTIFICATE OF COMPETENCY

The following fees are payable for the issuance of temporary Certificate of Competency:

Subject-matter

Fees

(a)

temporary Certificate of Competency as an Electrical Services Engineer 300

Suggest a correction

(b)

temporary Certificate of Competency as a Competent Electrical Engineer 200

Suggest a correction

(c)

temporary Certificate of Competency as an Electrical Supervisor 150

Suggest a correction

(d)

temporary Certificate of Competency as a Grid-Connected Photovoltaic

System Designer 150

Suggest a correction

(e)

temporary Certificate of Competency as an Off-Grid Connected

Photovoltaic System Designer 150

Suggest a correction

(f)

temporary Certificate of Competency as a Chargeman (operational voltage exceeding 1kV up to 33kV)

Suggest a correction

(g)

temporary Certificate of Competency as a Chargeman (operational voltage up to 1kV)

Suggest a correction

(h)

temporary Certificate of Competency as a Wireman (3 Phase)

Suggest a correction

(i)

temporary Certificate of Competency as a Wireman (1 Phase)

Suggest a correction

(j)

temporary Certificate of Competency as a Cable Jointer 40

Suggest a correction

Part VII

PART VII

[Regulation 57]

Suggest a correction

FEES FOR PROCESSING EXAMINATION APPLICATION, EXAMINATION,

ENDORSEMENT, REPLACEMENT AND REISSUANCE OF CERTIFICATE OF

COMPETENCY

The following fees shall be charged for processing an examination application, examinations for Certificates of Competency, and for the endorsement, replacement and reissuance of the

Certificates of Competency:

Subject-matter

Fees

(a)

for processing an application for each examination 20

Suggest a correction

(b)

for examination for a Certificate of Competency as an Electrical Services

Engineer 220

Suggest a correction

(c)

for examination for a Certificate of Competency as a Competent Electrical

Engineer 220

Suggest a correction

(d)

for examination for a Certificate of Competency as an Electrical Supervisor 165

Suggest a correction

(e)

for examination for a Certificate of Competency as a Grid-Connected

Photovoltaic System Designer 165

Suggest a correction

(f)

for examination for a Certificate of Competency as an Off-Grid Photovoltaic

System Designer 165

Suggest a correction

(g)

for examination for a Certificate of Competency as a Chargeman 110

Suggest a correction

(h)

for examination for a Certificate of Competency as a Wireman 60

Suggest a correction

(i)

for examination for a Certificate of Competency as a Cable Jointer 60

Suggest a correction

(j)

for endorsement of any Certificate of Competency 60

Suggest a correction

(k)

for replacement of any Certificate of Competency as an Electrical Services

Engineer 330

Suggest a correction

(l)

for replacement of any Certificate of Competency as a Competent Electrical

Engineer 330

Suggest a correction

(m)

for replacement of any Certificate of Competency as an Electrical Supervisor 275

Suggest a correction

(n)

for replacement of any Certificate of Competency as a Grid-Connected

Photovoltaic System Designer 275

Suggest a correction

(o)

for replacement of any Certificate of Competency as an Off-Grid Photovoltaic

System Designer 275

Suggest a correction

(p)

for replacement of any Certificate of Competency as a Chargeman 220

Suggest a correction

(q)

for replacement of any Certificate of Competency as a Wireman 110

Suggest a correction

(r)

for replacement of any Certificate of Competency as a Cable Jointer 110

Suggest a correction

(s)

for reissuance of any Certificate of Competency 30

Suggest a correction

Part VIII

PART VIII

[Subregulation 66(2)]

Suggest a correction

FEES FOR REGISTRATION OF COMPETENT PERSON

The following fees are payable for the registration as a competent person in the following category under the age limits as specified in regulation 66:

Competent

Person

Registration Fees

1 year 2 years 3 years 4 years 5 years

(a)

Electrical

Services

Engineer 300 600 900 1,200 1,500

Suggest a correction

(b)

Competent

Electrical

Engineer 200 400 600 800 1,000

Suggest a correction

(d)

Grid-Connected

Photovoltaic

System

Designer 150 300 450 600 750

Suggest a correction

(e)

Off-Grid

Connected

Photovoltaic

System

Designer 150 300 450 600 750

Suggest a correction

(f)

Chargeman

(operational voltage exceeding 1kV up to 33kV)

110 220 330 440 550

Suggest a correction

(g)

Chargeman

(operational voltage up to 1kV)

60 120 180 240 300

Suggest a correction

Part IX

PART IX

[Regulation 68]

Suggest a correction

COMPETENT PERSONS TO SUBMIT PLANS, DRAWINGS AND SPECIFICATIONS

Competent Person

Prepare and Submit to

Voltage/Ampere Limit of

Installation

(a)

Wireman with Single Phase

Restriction

Licensee

Low voltage single phase only

Suggest a correction

(b)

Wireman with Three Phase

Restriction

Licensee

Low voltage and receiving electricity from licensee via a switchgear rated at 60

amperes and below

Suggest a correction

(c)

Electrical Supervisor

Licensee

Low voltage and receiving electricity from licensee via a switchgear rated at 100

amperes and below

Suggest a correction

(d)

Competent Electrical Engineer who is not registered with the Board of Engineers as a

Professional Engineer

Licensee

Low voltage only

Suggest a correction

(e)

Competent Electrical

Engineer who is registered with the Board of Engineers as a Professional

Engineer

Any person or authority in Malaysia

No limit

Suggest a correction

(f)

Electrical Services Engineer who is registered with the Board of Engineers as a Professional

Engineer

Any person or authority in Malaysia

No limit

Suggest a correction

Part X

PART X

[Regulation 77]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS AN

ELECTRICAL SERVICES CONTRACTOR

The following fees are payable for the issuance or renewal of a Certificate of Registration as an Electrical Services Contractor working on the following operational voltage:

Years

Operational Voltage in Kilovolts

Below 11kV

11kV to 33kV

132kV

Above 132kV

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

1 1,000 500 1,100 550 2,200 1,100 5,000 2,500 2 1,500 1,000 1,650 1,100 3,300 2,200 7,500 5,000 3 2,000 1,500 2,200 1,650 4,400 3,300 10,000 7,500 4 2,500 2,000 2,750 2,200 5,500 4,400 12,250 10,000 5 3,000 2,500 3,300 2,750 6,600 5,500 15,000 12,500

Part XI

PART XI

[Regulation 82]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION

AS AN ELECTRICAL CONTRACTOR

The following fees shall be payable for the issuance or renewal of a Certificate of

Registration as an Electrical Contractor in the following classes:

Years

Classes

Class A

Class B

Class C

Class D

Class PV

(Grid-Connected/

Off-Grid)

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

Issuance

Fees

Renewal

Fees

1 3,000 2,000 1,500 1,000 500 300 200 100 3,000 3,000 2 5,000 4,000 2,500 2,000 800 600 300 200 6,000 6,000 3 7,000 6,000 3,500 3,000 1,100 900 400 300 9,000 9,000 4 9,000 8,000 4,500 4,000 1,400 1,200 500 400 12,000 12,000 5 11,000 10,000 5,500 5,000 1,700 1,500 600 500 15,000 15,000

Part XII

PART XII

[Regulation 86]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS

A PRIVATE WIRING UNIT

The following fees shall be payable for the issuance or renewal of a Certificate of

Registration as a Private Wiring Unit:

1 year 2 years 3 years 4 years 5 years

Issuance Fees (RM)

330 550 770 990 1,210

Renewal Fees (RM)

220 440 660 880 1,100

Part XIII

PART XIII

[Regulation 90]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS AN ELECTRICAL

SIGN CONTRACTOR

The following fees shall be payable for the issuance or renewal of a Certificate of

Registration as an Electrical Sign Contractor:

1 year 2 years 3 years 4 years 5 years

Issuance Fees (RM)

550 880 1,210 1,540 1,870

Renewal Fees (RM)

330 660 990 1,320 1,650

Part XIV

PART XIV

[Regulation 94]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS

13

AN ELECTRICAL REPAIR CONTRACTOR

The following fees shall be payable for the issuance or renewal of a Certificate of

Registration as an Electrical Repair Contractor:

1 year 2 years 3 years 4 years 5 years

Issuance Fees (RM)

110 170 230 290 350

Renewal Fees (RM)

60 120 180 240 300

Part XV

PART XV

[Regulation 99]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS A

SWITCHBOARD MANUFACTURER

The following fees shall be payable for the issuance or renewal of a Certificate of Registration as a Switchboard Manufacturer in the following classes:

Years

Classes

Switchboard operated at low voltage

Switchboard operated at higher than low voltage

Issuance Fees

Renewal Fees

Issuance Fees

Renewal Fees

1 660 330 3,300 2,200 2 990 660 5,500 4,400 3 1,320 990 7,700 6,600 4 1,650 1,320 9,900 8,800 5 1,980 1,650 12,100 11,000

Part XVI

PART XVI

[Subregulation 100(4)]

Suggest a correction

FEES FOR CERTIFICATE OF APPROVAL TO MANUFACTURE,

14

IMPORT, DISPLAY, SELL OR ADVERTISE EQUIPMENT

The following fees shall be payable for the issuance or renewal of a Certificate of Approval to manufacture, import, display, sell or advertise each equipment operated at the following voltage ratings:

Voltage rating

Issuance Fees for 12

months (RM)

Renewal Fees for 12

months (RM)

Part XVII

PART XVII

[Subregulation 102(4)]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION AS CONFORMITY ASSESSMENT

BODY

The following fees shall be payable for the issuance and renewal of a Certificate of

Registration as Conformity Assessment Body:

Year

Issuance Fees (RM)

Renewal Fees (RM)

1 5,000 4,000 2 10,000 8,000 3 15,000 12,000

Part XVIII

PART XVIII

[Subregulation 103(4)]

Suggest a correction

FEES FOR CERTIFICATE OF REGISTRATION TO MANUFACTURE/TO IMPORT

15

The following fees shall be payable for the issuance or renewal of a Certificate of Registration to manufacture or to import:

Years

Issuance Fees (RM)

Renewal Fees (RM)

Manufacturer

Importer

Manufacturer

Importer 1 500 800 250 400 2 1,000 1,600 500 800 3 1,500 2,400 750 1,200 4 2,000 3,200 1,000 1,600 5 2,500 4,000 1,250 2,000

THIRD SCHEDULE

[Subregulation 12(2)]

16

CALCULATION OF MAXIMUM CURRENT DEMAND

FOR DOMESTIC INSTALLATION

This Schedule gives the determination of the maximum current demand for an installation and includes the current demand to be assumed for commonly used equipment.

The current demand of a final circuit is determined by summating the current demands of all points of utilisation and equipment in the circuit and, where appropriate, making an allowance for diversity. Typical current demands to be used for this summation are given in Table A.

The maximum current demand of a circuit supplying a number of final circuits may be assessed by using the allowances for diversity given in Table B which are applied to the total current demand of all the equipment supplied by that circuit and not by summating the current demands of the individual final circuits obtained as outlined above. In Table B the allowances are expressed as percentages of the rated full load current of the current-using equipment.

TABLE A

Current demand to be assumed for points of utilisation and current-using equipment

Point of utilisation or current-using equipment

Current demand to be assumed

Socket outlets other than 2A socket outlets

Rated current

Lighting outlet*

Current equivalent to the connected load, with a minimum of 100W per lampholder

Electric clock, electric shaver supply unit, shaver socket outlet, bell transformer, and current-using equipment of a rating not greater than 5 VA

May be neglected

Household cooking appliance

The first 10A of the rated current plus 30% of the remainder of the rated current plus 5A if a socket outlet is incorporated in the control unit

All other stationary equipment

Malaysian Standard rated current, or normal current

*NOTE — Final circuits for discharge lighting are arranged so as to be capable of carrying the total steady current, viz. that of the lamp(s) and any associated gear and also their harmonic currents. Where more exact information is not available, the demand in volt-amperes is taken as the rated lamp watts multiplied by not less than 1.

8. This multiplier is based upon the assumption that the circuit is corrected to a power factor of not less than 0.85 lagging, and takes into account control gear losses and harmonic currents.

TABLE B

Allowances for Diversity

17

Purpose of final circuit fed from conductors or switchgear to which diversity applies

Individual household installations, including individual dwellings of a block

Section 2

Power 100% of total current demand up to 10

Suggest a correction

Section 3

Amperes + 50% of any current demand in excess of 10 Amperes

Suggest a correction

Cooking appliances 10 Amperes + 30% f.l. of connected cooking appliances in excess of 10 Amperes + 5

Section 4

Amperes if socket outlet incorporated in unit

Suggest a correction

100% f.l. of largest appliance + 100%

f.l. of 2nd largest appliance + 25% f.1. of remaining appliances

Section 5

Water-heaters (thermostatically controlled)

Suggest a correction

Section 6

No diversity allowable

Suggest a correction

Standard arrangements of final circuits using socket outlets 100% of current demand of largest circuit +

40% of current demand of every other circuit

Section 7

Suggest a correction

Socket outlets other than those included in 6 above and stationary equipment other than those listed above 100% of current demand of largest point of utilisation + 40% of current demand of every other point of utilisation

* For the purpose of this Table, an instantaneous water-heater is deemed to be a water-heater of any loading which heats water only while the tap is turned on and therefore uses electricity intermittently.

# It is important to ensure that the distribution boards are of sufficient rating to take the total load connected to them without the application of any diversity.

18

FOURTH SCHEDULE

[Subregulation 111(1)]

ENERGY PERFORMANCE TESTING STANDARDS, MINIMUM ENERGY

PERFORMANCE STANDARDS AND EFFICIENCY RATINGS FOR THE

PURPOSE OF EFFICIENT USE OF ELECTRICITY

Equipment

Type of

Equipment

Energy

Performance

Testing

Standards

Minimum Energy

Performance

Standards (MEPS)

Efficiency Ratings

Refrigerator

(b)

two-doors

MS IEC

62552:2011

(Household refrigerating appliances -

MEPS’s value = 2 Star

Star

Star Index

Rating

Value 5

+ 25% ≤

Star Index

Characteristic 4

+ 10% ≤

and test

Star Index methods)

<+ 25%

3

-10% ≤

Star Index

<+ 10%

2

-25% ≤

Star Index

<-10%

1

-35% ≤

Star Index

<-25%

19

Equipment

Type of

Equipment

Energy

Performance

Testing

Standards

Minimum Energy

Performance

Standards

(MEPS)

Efficiency Ratings

Air

Single split MS ISO

MEPS’s

Suggest a correction

(a)

Cooling capacity conditioner wall mounted 5151:2004

value = 2 Star

< 4.5kW:

air conditioner capacity up to 25,000 Btu/h

(Non-ducted air conditioners and heat pumps:

Testing and

Star

Star Index

Rating

Value 5

≥ 11.94

rating for 4 11.16 – 11.93

perfomance)

3 10.37 – 11.15 2 9.56 – 10.3 1 9.00 – 9.55

Suggest a correction

(b)

4 . 5 k W ≤ c o o l i n g capacity ≤ 7.1kW:

Star

Star Index

Rating

Value 5

≥ 10.71 4 9.83 – 10.70 3 8.94 – 9.82 2 8.03 – 8.93 1 7.50 – 8.02

Television

The type of television are of the

Suggest a correction

(a)

IEC 62087

Edition 2.0 2008-10

MEPS’s value = 2 Star

Star

Star Index

Rating

Value following list for power 5

+ 20% ≤

and of size up measurement

Star Index to or equal to at On Mode 4

+ 10% ≤

70 inches:

Suggest a correction

(b)

MS IEC

62301:2006

for power

Star Index

<+20%

3

-10% ≤

Suggest a correction

(c)

light

< -10%

emitting 1

-30% ≤

diode

Star Index

(LED)

< -20%

Suggest a correction

(d)

cathode ray tube

(CRT)

20

Equipment

Type of

Equipment

Energy

Performance

Testing

Standards

Minimum Energy

Performance

Standards

(MEPS)

Efficiency Ratings

Domestic fan

Suggest a correction

(d)

ceiling

MS 1220:2001

(performance and construction of electric circulating fans and regulators)

second revision

MEPS’s value = 2 Star

Suggest a correction

(a)

Ceiling fan:

Star

Star Index

Rating

Value 5

≥ 3.00 4 2.74 - 2.99 3 2.66 - 2.73 2 2.58 - 2.65 1 2.50 - 2.57

Suggest a correction

(b)

Pedestal, wall and desk fan:

Star

Star Index

Rating

Value 5

≥ 1.20 4 1.12 - 1.19 3 1.08 - 1.11 2 1.01 - 1.07 1 0.93 - 1.00

21

Equipment

Type of Equipment

Energy Performance

Testing Standards

Minimum Energy

Performance

Standards (MEPS)

Efficiency Ratings

Lighting

Suggest a correction

(a)

MS IEC 60969:

(Self-ballasted lamps for general lighting services-P e r f o r m a n c e requirements) for fluorescent lamp

Suggest a correction

(b)

LM 79-08 (IESNA

Approved Method for the electrical and photometric measurement of solid-state lighting products) for LED lights

Suggest a correction

(P)

(Self-ballasted

LED - l a m p s f o r g e n e r a l lighting services-p e r f o r m a n c e requirement)

Suggest a correction

(b)

Other lighting type:

NIL

* The Minimum Energy Performance Standards (MEPS) value for incandescent lamp shall not apply for the following use:

Suggest a correction

(e)

conservation of animals and as repellant for insects;

Suggest a correction

(i)

lamps that cannot be directly replaced with other type of lamp; and

Suggest a correction

(j)

incandescent lamp for other purposes deemed suitable by the Commission to be excluded.

Type

MEPS

(lm/W)

CFLi

(Self-ballasted)

4 < 9 W

55 9 – 15 W

60 16 – 24 W

60

CFL (Non integrated lamps)

≤ 0 W

60 11 – 26 W

65

≥ 27 W

85

LED Lamp 55

Incandescent

Lamp*

20

22

Made this 3 January 2024.

DATUK SERI PANGLIMA HAJI HAJIJI BIN HAJI NOOR,

Chief Minister of Sabah.

Suggest a correction