PRELIMINARY
Citation and commencement
/akn/my-12/state_subsid/2024/efficient-management-electrical-energy-regulations-2024
The full official text, structured for quick navigation. Copy any provision or jump straight to a section.
Quick answer
Efficient Management Electrical Energy Regulations 2024 is Malaysia State Subsidiary Legislation, cited as State Subsidiary Legislation 2024 2024, currently marked in force and first recorded in 2024.
Opening note
Part I
Citation and commencement
In these Regulations, unless the context otherwise requires —
“effective date” means the date of coming into operation of these Regulations;
“metering point” means the point of physical connection of the device measuring the current in the power conductor where electricity consumption is measured;
“private installation licensee” means a person granted a licence under the
Enactment to use, work or operate an installation solely for the supply of electrical energy to and for the use thereof on the person’s own property or premises; and
“registered electrical energy manager” means a person registered under regulation 14.
Application
any installation which receives electrical energy from a licensee a total electrical energy consumption equal to or exceeding 3,000,000kWh as measured at one metering point or more over any period not exceeding six consecutive months; or
any installation which is used, worked or operated by a private installation licensee with a total net electrical energy generation equal to or exceeding 3,000,000kWh over any period not exceeding six consecutive months.
For the purposes of subregulation (1) and wherever mentioned in these
Regulations —
for any installation which receives electrical energy from a licensee under paragraph (1)(a) before or on the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the effective date;
for any installation which receives electrical energy from a licensee under paragraph (1)(a) after the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the date the electrical energy supply is connected to the installation by the licensee;
for any installation which is used, worked or operated by a private installation licensee under paragraph (1)(b) before or on the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the effective date; and
for any installation which is used, worked or operated by a private installation licensee under paragraph (1)(b) after the effective date, the 3,000,000kWh is calculated over any period not exceeding six consecutive months from the date the installation starts to generate electrical energy.
Fees
The fees referred to in subregulation (1) shall be paid to the Commission by such means and in such manner as the Commission may determine from time to time.
5
Part II
Obligation to submit information to the Commission
A licensee who supplies electrical energy to any installation under paragraph 3(2)(b) shall submit to the Commission information or documents regarding the names and particulars of consumers whose total electrical energy consumption over any period not exceeding six consecutive months equals to or exceeds 3,000,000kWh, not later than one month after the expiry of the period of six consecutive months from the date the electrical energy supply is connected to the installation by the licensee.
A private installation licensee under paragraph 3(2)(c) shall submit to the
Commission information or documents regarding the total net electrical energy generation over any period not exceeding six consecutive months that equals to or exceeds 3,000,000kWh, not later than one month after the expiry of the period of six consecutive months from the effective date.
A private installation licensee under paragraph 3(2)(d) shall submit to the
Commission information or documents regarding the total net electrical energy generation over any period not exceeding six consecutive months that equals to or exceeds 3,000,000kWh, not later than one month after the expiry of the period of six consecutive months from the date the installation starts to generate electrical energy.
Notwithstanding subregulations (1) to (4), the Commission may, at any time by way of a written notice, direct any licensee or private installation licensee to provide, within the time as specified in the notice, any information or document as the Commission may require.
Any licensee or private installation licensee who is required to provide information or documents under this regulation shall ensure that the information
6
or documents provided are true, accurate and complete and shall provide a representation to that effect, including a representation that he or it is not aware of any other information which would make the information provided untrue or misleading.
Any licensee or private installation licensee who —
fails to disclose or omits to give any relevant information or document, or provides information or documents that he or it knows or has reason to believe is false or misleading, commits an offence under these Regulations.
Notification by the Commission
to appoint or designate a registered electrical energy manager to carry out the functions and duties under regulation 16 at the installation;
to submit a written confirmation of such appointment or designation under paragraph (a) to the Commission containing the name and particulars of the registered electrical energy manager as well as the date of expiry of his registration as an electrical energy manager;
the statement of policy for efficient electrical energy management of the installation;
the accounts and documents pertaining to efficient electrical energy management;
7
to submit the report in Form A of the Second Schedule that has been duly signed; and
The private installation licensee or consumer shall upon submitting the information and report under paragraphs (1)(c), (d) and (e) include a declaration by the registered electrical energy manager for the installation in Form B of the
Second Schedule.
Any private installation licensee or consumer required to submit the information and report under subregulations (1) and (2) shall ensure that the information and report submitted are true, accurate and complete and shall provide a representation to that effect, including a representation that he or it is not aware of any other information which would make the information and report that is provided untrue or misleading.
Any private installation licensee or consumer who —
fails to disclose or omits to give any relevant information or document, or provides information or documents that he or it knows or has reason to believe is false or misleading, commits an offence under these Regulations.
Obligation of private installation licensee or consumer
the information as required under paragraphs 6(1)(a) and (b) not later than three months from the date of the written notice; and
and the declaration under subregulation 6(2) not later than thirty days after the expiry of six consecutive months from the end of the period specified in paragraph 7(1)(a).
The private installation licensee or consumer shall continue to submit to the
Commission —
8
the information as specified in paragraph (1)(a) not later than three months;
and
the information and report as specified in paragraph (1)(b) not later than thirty days after the expiry of six consecutive months, from the end of the period specified in paragraph (1)(b), and shall thereafter be submitted accordingly within the periods as prescribed in this subregulation.
Any private installation licensee or consumer who fails to comply with subregulation (1) or (2) commits an offence under these Regulations.
Additional information
Any private installation licensee or consumer who fails to comply with subregulation (1) commits an offence under these Regulations.
Review
that the total net electrical energy generation or total electrical energy consumption for the reported period in Form A of the Second Schedule is below 3,000,000kWh;
that the private installation licensee or consumer has fully complied with the requirements of these Regulations; and
any other reason which the Commission deems fit to show efficient management of electrical energy at the installation for the reported period as in Form A of the Second Schedule.
The Commission shall, after reviewing the obligations of the private installation licensee or consumer under subregulation (1), by written notice notify the private
9
installation licensee or consumer that he or it is no longer required to further submit the information and report as specified in regulation 6.
The private installation licensee or consumer who is served with the written notice under subregulation (2) shall cease to submit the information and report as specified in regulation 6 with effect from the date of the notice.
Withdrawal
the total electrical energy consumption or total net electrical energy generation at the installation over any period of six consecutive months after the date of issue of the notice equals to or exceeds 3,000,000kWh;
or
for any other reason as the Commission deems fit, it is satisfied that the private installation licensee or consumer has not practised efficient management of electrical energy at the installation after the date of issue of the notice.
Any private installation licensee or consumer to whom the written notice issued under subregulation 9(2) is withdrawn in pursuance of subregulation (1), shall become subject to these Regulations with effect from the date of withdrawal of the notice.
Any withdrawal of the written notice issued under subregulation 9(2) by the
Commission shall be in writing and served upon the private installation licensee or consumer.
Part III
Registered electrical energy manager of installation
Any person who fails to comply with subregulation (1) commits an offence under these Regulations.
Qualification requirements
holds a certificate of registration as a Professional Engineer under the Registration of Engineers Act 1967 [Act 138] and possesses at least six months working experience in the efficient management of electrical energy at an installation;
holds a Degree in Science, Engineering, Architecture or its equivalent and possesses at least one year working experience in the efficient management of electrical energy at an installation; or
holds a Certificate of Competency issued by the Commission as an
Electrical Services Engineer or a Competent Electrical Engineer and possesses at least nine months working experience in the efficient management of electrical energy at an installation; and
he demonstrates knowledge of the requirements of the Enactment and these Regulations that satisfies the Commission.
Without prejudice to subregulation (1), the Commission may require any person to attend an interview to be conducted or caused to be conducted by the Commission on a date and at a location to be determined by the Commission to ascertain his qualifications.
Application for registration
any information and documents to substantiate the fact that the applicant has a proven track record as an electrical energy manager, or evidence to show that despite the lack of a track record, he has the necessary knowledge, skill and expertise to efficiently manage electrical energy.
Upon receipt of an application under subregulation (1), the Commission may, by written notice, require the applicant to submit any additional information or documents and the applicant shall comply with such requirement within the period as specified by the Commission.
If any additional information or documents as required under subregulation (2)
is not provided by the applicant within the period as specified by the Commission, the application shall be deemed to have been withdrawn by the applicant and shall not be further proceeded with, but such withdrawal shall not affect the right of the applicant to make a fresh application.
Issuance of certificate of registration
Where the application is approved, the Commission shall register the applicant as an electrical energy manager, and upon payment of the fee as prescribed in the
First Schedule, issue a certificate of registration.
Where the application is refused, the Commission may, upon the request of the applicant, provide reasons in writing to the applicant for such refusal.
The certificate of registration shall be in Form C of the Second Schedule, and the Commission may stipulate in the certificate any conditions or restrictions in respect of the registration.
Medical evidence of fitness of applicant
Notwithstanding subregulations 13(1) and (2), the Commission may require
12
medical evidence of the physical and mental fitness of the applicant, certified by a registered medical practitioner, to be produced by the applicant before a certificate of registration as an electrical energy manager is issued to him.
Functions and duties of a registered electrical energy manager
The registered electrical energy manager shall have the following functions and duties:
to audit and analyse the total electrical energy consumption or total net electrical energy generation at the installation, including the significant end use of electricity;
to advise the private installation licensee or consumer in developing and implementing measures to ensure efficient management of electrical energy at the installation; and
to monitor effective implementation of the measures referred to in subparagraph (ii);
he shall supervise the keeping of records on efficient management of electrical energy at the installation and verify its accuracy; and
he shall ensure that the private installation licensee or consumer submits the information and report under paragraphs 6(1)(c), (d) and (e) within the periods as specified in regulation 7.
Validity period of registration and renewal
Where the person who is registered under subregulation (1) intends to continue to do any work, act or thing for which such registration is required after the expiry of the period of his registration, he shall, at least two months before the date of expiry of his registration, renew his registration.
13
The Commission shall renew the registration of an electrical energy manager if the Commission is satisfied that —
he has complied with the conditions or restrictions as stipulated in the certificate of registration; and
he has paid the fee as prescribed in the First Schedule.
Cancellation of registration of a registered electrical energy manager
he has contravened or failed to comply with any provision of the
Enactment or these Regulations;
he has obtained the certificate of registration by making or causing to be made any false or fraudulent declaration, certification or representation, either in writing or otherwise;
he has used the certificate of registration for a purpose that differs from that for which it was issued or in a manner that is intended to mislead or deceive the public; or
he has failed to carry out the functions and duties as specified in regulation 16.
Where the Commission intends to cancel the certificate of registration under subregulation (1), the Commission shall notify the registered electrical energy manager in writing of its intention.
The registered electrical energy manager shall within fourteen days from the date of issue of the written notice under subregulation (2) provide a written submission to the Commission stating the reasons why his certificate of registration should not be cancelled.
The Commission shall give due consideration to the written submission made by the registered electrical energy manager before making any decision.
Where the Commission, after giving due consideration to the written submission, cancels the certificate of registration, the Commission shall issue a
14
notice of cancellation to the registered electrical energy manager together with the reasons for the cancellation.
The cancellation of the certificate of registration shall take effect on the expiry of twenty-one days from the date of the notice of cancellation.
Notwithstanding subregulation (1), where the Commission is of the opinion that urgent action is required to protect the interest of the public and that action relates to the functions and duties of the registered electrical energy manager, the
Commission may immediately cancel the certificate of registration issued to the registered electrical energy manager by serving upon him a notice of cancellation.
Part IV
Register
The Commission shall delete from the register the name and particulars of every registered electrical energy manager whose certificate of registration has been cancelled under regulation 18.
Replacement of certificate of registration
An application made under subregulation (1) shall be accompanied with —
in the case of loss of the certificate of registration, a police report or statutory declaration made before a Magistrate or Commissioner for
Oaths regarding the loss;
15
in the case of defacement of the certificate of registration, the defaced certificate of registration;
Where the Commission is satisfied that the loss or defacement of the certificate of registration was not the result of any fraud or negligence, the Commission may issue a replacement certificate of registration with the word “DUPLICATE” endorsed on it.
Certified true copy of certificate of registration
Upon payment of the application fee as prescribed in the First Schedule, the
Commission shall provide a certified true copy of the certificate of registration to the registered electrical energy manager concerned.
General penalty
Any person who commits an offence under these Regulations shall, on conviction, be liable to a fine not exceeding twenty thousand ringgit or to imprisonment for a term not exceeding one year or to both.
Extension of time
Notwithstanding anything contained in these Regulations, where a period is specified under these Regulations or in any notice issued by the Commission pursuant to these Regulations for any act to be done or condition to be fulfilled, the person affected may request for an extension of time in writing and the Commission may grant such extension of time as it deems fit.
Service of notice
A notice which is sent by registered post shall be deemed to have been served on the person to whom it is addressed on the day succeeding the day on which the notice would have been received in the ordinary course of post, if it is addressed —
in the case of a company, partnership or body of persons having a registered office in Malaysia, to that registered office;
in the case of a company, partnership or body of persons not having a registered office in Malaysia —
to any registered office of the company, partnership or body of persons (wherever that office may be situated);
to the principal place of business or other activity of the company, partnership or body of persons (wherever that place may be situated); or
to any individual authorized (by or under the law of any place where the company, partnership or body of persons is incorporated, registered or established) to accept service of the notice; and
in the case of an individual, to his last known address as contained in the register.
17
FIRST SCHEDULE
[Regulation 4]
FEES
No.
Type of fees
Fees 1.
Application for registration as an electrical energy manager
RM200 per application 2.
Issuance/renewal of certificate of registration
RM250 per year 3.
Application for replacement of certificate of registration
RM100 per copy 4.
Application for certified true copy of certificate of registration
RM50 per copy
18
SECOND SCHEDULE
FORM A
[Paragraph 6(1)(d)]
REPORT ON EFFICIENT MANAGEMENT OF ELECTRICAL ENERGY
FOR THE YEAR ………………………..
Name of Private Installation Licensee/Consumer*:
…………………………………………………………………………………………………
Address of Private Installation Licensee/Consumer*:
…………………………………………………………………………………………………
………………………………………………………………………………………………....
Telephone No.
:
………………………………
Fax No.
:
………………………………
E-mail Address
:
………………………………
Installation Registration No.
:
……..……………………….
Total consumption of electrical energy/total net generation of electrical energy* for six consecutive months in the period reported........................................................ kWh
Total consumption of electrical energy/total net generation of electrical energy* for six consecutive months in the previous period reported.......................................... kWh
Efficient management of electrical energy improvement measures implemented in the period reported
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Efficient management of electrical energy improvement measures proposed but not implemented together with reasons for not implementing them
………………………………………………………………………………………………
………………………………………………………………………………………………
19
Estimated savings in total consumption of electrical energy/total net generation of electrical energy* achieved as a result of efficient management of electrical energy improvement measures implemented in the period reported ...................... kWh
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Name(s) and registration number(s) of the registered electrical energy manager(s) responsible for the installation in the period reported
…………………………………………………………………………………………………
…………………………………………………………………………………………………
We, .................................................................the private installation licensee/consumer*, declare and confirm that all information given in this report and in the attached annexes are true and accurate.
Date:
…………………………………………..
**Name: ............................................... )
I.C. No. ................................................. )
Designation: .......................................... )
for and on behalf of private
)
installation licensee/consumer*
)
Note:
If the space is insufficient to provide the information or particulars, please attach annexes. Every annex shall be initialled by the above signatory.
* Delete whichever is not applicable.
** This form shall not be signed by the registered electrical energy manager for the installation.
20
FORM B
[Subregulation 6(2)]
DECLARATION BY REGISTERED ELECTRICAL ENERGY MANAGER
I, ........................................................................... the registered electrical energy manager of the private installation licensee/consumer*....................................................., hereby declare and confirm that:
I have been given sufficient access to the records of the private installation licensee/
consumer* to enable me to confirm the report in Form A of the Second Schedule;
To the best of my knowledge and belief, the report in Form A of the Second Schedule was well prepared based on the actual implementation of efficient management of electrical energy improvement measures at the installation for the reported period;
I have evaluated the efficient management of electrical energy performance and costs at the installation; and
(any other information deemed suitable)
Date:
SIGNED BY: …………………………………..
(Name) ………………………….
(Registration No.) ………………
Note:
If the space is insufficient to provide the information or particulars, please attach annexes. Every annex shall be initialled by the above signatory.
* Delete whichever is not applicable.
21
PHOTO
Certificate No.:……………
FORM C
[Subregulation 14(4)]
CERTIFICATE OF REGISTRATION AS AN ELECTRICAL ENERGY MANAGER
In accordance with subregulation 14(2) of the Efficient Management of Electrical Energy
Regulations 2024, this certificate of registration is issued to ……….................…………………...
(name of holder)
Identity Card No.: ………….……...………… Date of Birth:……………………………..
and authorizes the holder to carry out the functions and duties of a registered electrical energy manager for a period of .................... year(s)* from the date of issue as stated below. This certificate is issued to the above named person and shall not be used by any other person.
RESTRICTION, IF ANY:
CONDITIONS (see overleaf)
Date of issue:……………………………..
*Date of expiry:…………………………..
Fee: RM…………………………………..
.....................................................
Commission
Note:
In the event that this Certificate of Registration comes into the possession of any person other than the person to whom it has been issued, it shall be returned immediately to the Commission.
*Not less than one year and not more than five years from the date of issue.
22
Made this 3 January 2024.
DATUK SERI PANGLIMA HAJI HAJIJI BIN HAJI NOOR,
Chief Minister of Sabah.